<div dir="ltr"><div class="gmail_default" style="font-size:small"><p class=""><b><span style="font-size:20pt;font-family:SimSun">Evolution Environmental Group (E2) Process Engineered Fuel (PEF) to Replace Coal in Cement Kilns</span></b></p><p class="" align="left"><b><span style="font-family:Calibri,sans-serif"> </span></b></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">Evolution Environmental Group, LLC (“E2”) provides alternative processed fuel solutions to cement and other high-energy use industries. E2’s expertise is in processing solid waste (primarily non-recyclable plastic and paper) into a high Btu content fuel known as Processed Engineered Fuel (“PEF”), primarily designed for and sold to cement manufacturers to be used in lieu of coal in firing kilns.   </span></p><p class="MsoNormal"><b><span style="font-family:Calibri,sans-serif"> </span></b></p><table class="" border="0" cellspacing="0" cellpadding="0" style="border-collapse:collapse"><tbody><tr style="height:18.35pt"><td width="779" valign="top" style="width:467.5pt;border:1pt solid black;padding:0in;height:18.35pt"><p class="" align="center" style="text-align:center">Date: Friday, April 10, 2015</p><p class="" align="center" style="text-align:center">Time: 8:00am – 10:00am</p><p class="" align="center" style="text-align:center">Organizer: Gelvin Stevenson, PhD</p><p class="" align="center" style="text-align:center">Sponsor and Host: Crowell & Moring. LLP</p><p class="" align="center" style="text-align:center">Location: 590 Madison Ave. at 57<sup>th</sup> Street, southwest corner, 22<sup>nd</sup> floor</p></td></tr></tbody></table><p class="MsoNormal"><b><span style="font-family:'Apple Symbols'"> </span></b></p><p class="MsoNormal"><b><u><span style="font-size:10pt;font-family:'Apple Symbols'">The PEF Industry</span></u></b><br></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">PEF is residual solid waste, primarily paper and plastic, which has been processed into a usable fuel.  Unprocessed residual solid waste is typically deposited in landfills at a cost of $30 to $80 a ton. E2 believes that offering residual solid waste contractors a 20% discount to their current tipping fees guarantees an adequate supply of feedstock for a PEF process plant.</span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'"> </span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">Cement kilns consume a tremendous amount of energy.  Typically they burn either coal or natural gas.  Many plants can burn other fuels such as hazardous waste, biomass, used tires or oil.  Fuel choices depend primarily on Btu values, replacement costs, emissions and operations.  Each situation is different but the dynamic is the same; a cement kiln burns a ton of coal, but that ton of coal can be replaced by a ton of PEF at half the cost. Since energy is the largest cost of a cement plant, these savings can be significant.</span></p><p class="MsoNormal"><b><u><span style="font-size:10pt;font-family:'Apple Symbols'"><span style="text-decoration:none"> </span></span></u></b></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">PEF is an established industry in Europe, having started approximately fifteen years ago.    The equipment, processes and technical compliance are well established.  The economic drivers in the Europe are the same as in the U.S. except more so: increased tipping fees at landfills and high energy costs, the first being driven by the lack of land and the latter being the lower amount of coal. But as of yet, there are no large PEF plants in the US.</span></p><p class="MsoNormal"><b><u><span style="font-size:10pt;font-family:'Apple Symbols'"><span style="text-decoration:none"> </span></span></u></b></p><p class="MsoNormal"><b><u><span style="font-size:10pt;font-family:'Apple Symbols'">The Company</span></u></b></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">E2 was founded in 2006 and is headed by Herb Case.  Previously, Mr. Case helped establish the industry of cement kilns burning hazardous waste. His company named Cemtech was sold to a JV between Waste Management and Holcim Cement, two of the world’s largest companies in their respective industries of waste disposal and cement. At the time it was operating seven plants across the US. He has been active in Europe where he first consulted regarding alternative fuels and then headed up the building of a Bulgarian PEF plant for a cement producer.  Mr. Case is supported by Ed Morton, a cement industry professional who assisted in the building of the Bulgarian plant, has worked on the America cement PEF project and headed up the alternative fuels effort for Heidelberg Cement one of the world’s largest cement producers. </span></p><p class="MsoNormal"><span style="font-family:Calibri,sans-serif"> </span></p><div style="border:1pt solid windowtext;padding:1pt 4pt"><p class="MsoNormal" style="border:none;padding:0in"><span style="font-family:Calibri,sans-serif">Register at </span><a href="http://www.eventbrite.com/o/greentech-investors-forum-4795149719?s=36231386" target="_blank"><span style="font-size:11.5pt;font-family:'Helvetica Neue',serif;color:rgb(0,170,242);letter-spacing:0.4pt;background-image:initial;background-repeat:initial">Greentech Investors Forum, April 10: EE Group</span></a></p><p class="MsoNormal" style="border:none;padding:0in"><span style="font-family:Calibri,sans-serif">Or contact Gelvin at </span><a href="mailto:gelvin.stevenson@gmail.com"><span style="font-family:Calibri,sans-serif">gelvin.stevenson@gmail.com</span></a><span style="font-family:Calibri,sans-serif">.</span></p><p class="MsoNormal" style="border:none;padding:0in"><span style="font-family:Calibri,sans-serif"> </span></p></div><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'"> </span></p><p class="MsoNormal"><b><u><span style="font-size:10pt;font-family:'Apple Symbols'">The South Florida Project</span></u></b></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">For the last year, E2 has managed the provision of PEF to a cement plant in South Florida. This included overseeing the processing, delivery and burning of the PEF. In 2014, the cement plant burned over 6,000 tons of PEF reaching a level of eight tons per hour.  The cement plant owner has a long history of working with E2 and has utilized PEF at its other facilities. It requested that E2 develop, construct, manage and own a PEF production facility directly adjacent to its kiln. E2 is securing multi-year contracts for the PEF production off take and supply contracts for the requisite feedstock.</span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'"> </span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">Once constructed and processing 250 tons of PEF per day, the South Florida facility operating at 10 hours a day, 250 days a year (one shift), is expected to yield revenue of about $5 million, split about equally between tipping fees and PEF sales, and achieve an operating margin of some 60%.</span></p><p class="MsoNormal"> <br></p><div style="border:1pt solid windowtext;padding:1pt 4pt"><p class="" style="border:none;padding:0in"><span lang="EN-GB">GIF thanks Investors Circle for its generous support, Geoff Miles and Chino Maduagwu for developing and operating GIF’s video, social media and design capabilities, Tonia Popke for her financial expertise, and Jesse Goldstein, PhD, for his continued assistance. </span></p></div><p class=""><b><u><span style="font-size:10pt;font-family:'Apple Symbols'">Funding</span></u></b><br></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">The company is raising $150,000 in limited liability units to initiate construction activities such as site preparation and engineering as well as equipment purchase deposits for the S. Florida facility</span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'"> </span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">With the completion of the assessment and preparation phase, E2 will have secured equipment purchasing and contractors to have a fully functioning facility within 9 months of breaking ground. It is expected that the total cost of the facility, including equipment, construction and ramp up to be $8.5mm. This S. Florida facility will be a stand-alone legal entity. The sources for this $8.5mm are being confirmed and expected to be equipment finance companies, and project-related lenders.</span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'"> </span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">The company believes that once positioned as the initial domestic PEF player it will be in an advantageous position to build at least 10 and possibly as many as 25 processing facilities over the next decade.</span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'"> </span></p><p class="MsoNormal"><b><u><span style="font-size:10pt;font-family:'Apple Symbols'">Summary</span></u></b></p><p class="MsoNormal"><i><span style="font-size:10pt;font-family:'Apple Symbols'">Compelling model for energy savings and environmental impact</span></i></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">The company sources feedstock from multiple suppliers of municipal solid waste (MSW) whom save significant amounts in lieu of taking waste to landfills.  The waste is processed into a fuel (PEF).  The fuel is sold to cement kilns for use in lieu of coal.  The energy savings based on Btu equivalency can be significant, upwards of 50%, for the cement kiln.</span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'"> </span></p><p class="MsoNormal"><i><span style="font-size:10pt;font-family:'Apple Symbols'">Long Term Contracts for Supply and Off Take</span></i></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">E2 will have in place both feedstock and PEF supply contracts prior to finalizing premise lease and equipment purchase.  It is anticipated that a local MSW hauler will be the primary feedstock source although E2 will have the ability to bring in other feedstock.    </span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'"> </span></p><p class="MsoNormal"><i><span style="font-size:10pt;font-family:'Apple Symbols'">Proven Technology and Processes</span></i></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">E2 has built a PEF plant at the cement producer’s Bulgarian facility.     There are a number of PEF plants in Europe.  The ability to erect a facility takes a combination of cement operations know how, equipment understanding and art.  The technology and equipment have been developed over the last fifteen years in Europe.  </span></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'"> </span></p><p class="MsoNormal"><i><span style="font-size:10pt;font-family:'Apple Symbols'">Experienced Effective Management Team</span></i></p><p class="MsoNormal"><span style="font-size:10pt;font-family:'Apple Symbols'">E2’s senior management has unparalleled experience in successful assessing, designing, constructing and operating PEF facilities for cement producers. In particular for the S. Florida cement plant owner, E2 has provided extensive support over a number of years in the management of all aspects of the PEF production, supply and quality control program for this owner.</span></p><p class="MsoNormal"><span style="font-family:Calibri,sans-serif;font-size:11pt"> </span><br></p><div style="border:1pt solid windowtext;padding:1pt 4pt"><p class="" style="border:none;padding:0in"><span style="font-size:11pt;font-family:Calibri,sans-serif">Disclaimer: The Greentech Investors Forum (GIF) is not soliciting funds for the presenting companies, nor is it encouraging parties to invest in them. We try to find good companies—not necessarily good investments. They have been advised on what is acceptable in terms of predicted results, but GIF takes no responsibility for what they actually do, say, or how they perform in the future.</span></p></div><p class=""><b style><span style="font-family:Calibri,sans-serif">Security:</span></b><span style="font-family:Calibri,sans-serif">              If there is a problem at the Security Desk, please contact Ellen Reilly at </span><a href="tel:%28212%29%20895-4265" style><span style="font-family:Calibri,sans-serif">(212) 223-4000</span></a><span style="font-family:Calibri,sans-serif"> (first choice) or Gelvin Stevenson at 917-599-6089.  </span><br></p><p class="" style="margin-left:1in"><b>Fees:</b>                 $50, payable ahead of time or at the door. Cash or checks and credit cards accepted.</p><p class="" style="margin-left:1in">$25 for call-in. Registered call-ins will be emailed the call-in numbers and, if available, the slides to be presented.</p><p class="">                        $25 for members of Affiliated Groups</p><p class="">                        $20 for students and faculty.</p><p class="MsoNormal"><span style="font-family:Calibri,sans-serif"> </span><b>Agenda:</b>           8:00 to 8:30  -     Networking</p><p class=""></p><p class="">                        8:30 to 8:40  -     Introductions</p><p class="" style="margin-left:0.5in;text-indent:0.5in"><span style="font-size:11pt;font-family:Calibri,sans-serif">8:40 to 9:10  -     Herb Case, Founder, President and CEO</span><span style="font-family:'Times New Roman Italic',serif"></span></p><p class="MsoNormal" style="margin-left:1in;background-image:initial;background-repeat:initial"><span style="font-family:Calibri,sans-serif">9:10 to 9:30  -     TBA</span><span style="font-size:9.5pt;font-family:Calibri,sans-serif"></span></p><p class="" style="margin-left:1in"><span style="font-size:11pt;font-family:Calibri,sans-serif">9:30 to 10:00  -   Discussion</span></p><p class="MsoNormal"><span style="font-family:Calibri,sans-serif"> </span></p><p class=""><span style="font-family:Calibri,sans-serif">To register, visit this Eventbrite site </span><a href="file:///C:/Users/Gelvin/Documents/Greentech%20Investors%20Forum%20GIF/Announcements/Greentech%20Investors%20Forum"><span style="font-family:Calibri,sans-serif">Greentech Investors Forum</span></a><span style="font-family:Calibri,sans-serif"> or send your contact information to Gelvin Stevenson at </span><a href="mailto:gelvin.stevenson@gmail.com"><span class=""><span style="font-size:12pt;font-family:Calibri,sans-serif">gelvin.stevenson@gmail.com</span></span></a><span style="font-family:Calibri,sans-serif"> or 917-599-6089. And contact Gelvin If you have questions or need more information.</span></p><h2><span style="font-family:Calibri,sans-serif">Bios</span></h2><p class="MsoNormal" style="text-align:justify;background-image:initial;background-repeat:initial"><u><span style="font-size:9.5pt">Herbert Case, President & Chief Executive Officer</span></u><span style="font-size:9.5pt"> is E2’s founder and has been associated with the creation and successful implementation of waste-derived alternative fuel programs at cement kilns throughout the US and Europe for over 35 years.  These initiatives created sustainable, beneficial use solutions for large energy users, waste service companies and private and public sector waste generators.  The typical project format was Design, Build, Finance & Operate (“DBFO”) at the energy user site, and providing “win-win” results to stakeholders and helped establish the mainstream business model for alternative fuel use as a partial replacement for burning fossil fuels as a viable environmentally friendly alternative to landfill and commercial incineration on a global scale.</span></p><p class="MsoNormal" style="text-align:justify;background-image:initial;background-repeat:initial"><span style="font-size:9.5pt"> </span></p><p class="MsoNormal" style="text-align:justify;background-image:initial;background-repeat:initial"><span style="font-size:9.5pt">Mr. Case founded a start-up, CEMTECH, Inc., in 1980 in the US from several related service providers and led the company into being one of the nation’s market leaders for the collection and preparation of hazardous and non-hazardous wastes into alternative fuels and raw materials, used in cement kilns as a substitute for conventional fuels.  This included identifying and developing the human and technical resources to carry out the growth and maintenance of business activities and ongoing project management in difficult environments.  During this period Mr. Case was a charter member of the National Association of Solvent Recyclers (“NASR”) and the Cement Kiln Recycling Coalition (“CKRC”) in Washington, DC (still active) to help foster this work in the US.  CEMTECH was acquired in the early 1990’s by a partnership of Chemical Waste Management, Inc., a unit of Waste Management, Inc. and the Holcim Group, a leading global cement producer, creating the largest alternative fuels business in the US at that time.</span></p><p class="MsoNormal" style="text-align:justify;background-image:initial;background-repeat:initial"><span style="font-size:9.5pt"> </span></p><p class="MsoNormal" style="text-align:justify;background-image:initial;background-repeat:initial"><span style="font-size:9.5pt">After a transitional period, Mr. Case left CEMTECH for another start up, CEVA INTERNATIONAL, Inc., a US environmental services and alternative fuels development company with subsidiaries in the Czech Republic, Hungary and Romania.  The company was a “hands on” multi-disciplined service firm for the transfer of proven know-how and capital assets to assist in the remediation of environmental damage caused by decades of abuse in former Soviet Bloc countries.  As a result, contaminated soils were restored to value and wastes were converted into cleaner and cheaper fuels for utilities and cement plants in the region.  The model was to import equipment and know-how from the US to apply proven recycling and cleanup techniques for the beneficial use of wastes generated from public/private sources or stored in lagoons from historical activities.  CEVA entered into definitive agreements to create alternative fuels businesses with HeidelbergCement in Hungary and joint alternative fuels shareholder companies with Holcim in Romania and TITAN Cement SA in Southeast Europe and Eastern Mediterranean regions. </span></p><div><span style="font-size:9.5pt"><br></span></div></div>
</div>